Last update: 12.03.2014

Products for Gas Turbine Power Plant and Steam Gas Turbine Power Plant
Type of construction/equipment Quantity
Diverter  Damper
- Frame 6, 7E, 9E, GE 9F, MHI 701F, GT-13E2, SGT6-5000F, LM6000, SGT5-4000F 58
- ø 2050 ( material grade: 10CrMo9-10) 4
- 2700x2700 ( material grade: 10CrMo9-10) 2
- 2800x2800 (material grade: 1.4541) 5
Blades
- for Diverter Damper (stainless steel) 86
- flue gas dampers 24
Diffusers
- Standard EGD2 - GT26 40
- Cone for SGT5-4000F 24
- Cone for SGT5-2000E 4
 
Exhaust Systems for GT-13 E 2 consisting of Inlet Ring, Horizontal Duct, Transition Ducts, Silencer Ducts, Stack Cans; Diverter Damper and Blanking Plate; Support Structure 4
 
Equalizer (material grade: 13CrMo45) 2
 
Inlet Ring (material grade: 13CrMo45) 1
 
Filter house (for cooling system of inlet air) 1
 
Inlet Plenum 1
 

 

PIPELINES
for Rafinery
Project:
- Solvay
- Escorez 5000
- Prime G
324 T
for Power Stations and CHP Plants
- Paroseni Power Station
- Łagisza Power Station
- Bełchatów Power Station
- Bielsko-Biała CHP Plant
535 T
 

 

OTHER PRODUCTS among others
Marine and Elevated Flares 5 Units (4 Units - SS, 1 Unit - CS)
Spray-Desuperheaters (3 Units)
Manifolds
Circulation pipelines supports
Building steel construction
Swivel crane arm (2 Units)
Dampers, gates, grating (from material grade 1.4301)
Exhaust ducts for Block 5 and 6 in Power Station Bełchatów (4 Units)
Pipelines supports
Mill hot air safety gate valves (4 Units)
Acoustic walls panles (2 Units)
Furnace casing construction for permanent mold casting in the aluminium foundry (2 Units)
Guillotine/slide gate dampers (Ø 900, Ø 2300)
Connection ducts made from 16Mo3 (4 Units)
Supports and clamping rings for pipelines
 

 

ASSEMBLY WORKS
YearProjectScope of workQuality (Units)/ weight
2008/2009 Emile Hutchet Power Plant 828 MW Diffuser and EJ assembly on site (France) 2
2009/2010 Power Station Bełchatów Block 858 MW Assembly works on Rotaty Air Preheater (LUVO) 1480 T
2010 Mellach Power Plant 850 MW Diffuser and EJ assembly on site (Austria) 2
2010 Power Station Bełchatów Block 858 MW Flue gas return ducts for mill 1, 2, 8 105 T
2010 Modernization of Block No. 5 in Power Station Bełchatów 380 MW Erection works of pipelines from material grades: 1.4903 (P91), 1.4922 (X20CrMoV11-1), 1.7335 (13CrMo45), 1.7380 (10CrMo910), 1.5415 (16Mo3), 1.0038 (St 37) 334 T
2011 Hemweg 9 Power Plant 435 MW Diffuser and EJ assembly on site (the Netherlands) 1
2011 Repair of chimney No. 2 Temporary exhaust ducts assembly (area of cement plant in Ożarów) 65 T
2011/2012 Diemen Power Plant 435 MW Diffuser and EJ assembly on site (the Netherlands) 1
2011/2012 Toul Power Plant 435 MW Diffuser and EJ assembly on site (France) 1
2012 Knapsack 2 Power Plant 435 MW Diffuser and EJ assembly on site (Germany) 1
2012 Pocerady Power Plant 841 MW Diffuser and SS Cone assembly on site (Czech Republic) 2
 

Our website uses Cookies.

Find out more about the purpose of their use and the possibility of changing their settings in your browser. Learn more

I understand
Number of visitors: 161375

Copyright © Finow. All Rights Reserved.