In the period from 28 June to 25 August 2021. FINOW POLSKA Sp. z o.o. carried out a project commissioned by ERBUD INDUSTRY. The project concerned the demolition of the K1-K2 boiler house building at the Pulawy Nitrogen Plant.
The scope of work included:
The demolition of the K1-K2 boiler house building on the premises of Zakłady Azotowe Puławy was the first disassembly carried out by FINOW POLSKA Sp. z o.o.
The following photos show the disassembly of the grate
The scope of work included:
- dismantling of the boiler house wall cladding made of sandwich panels,
- dismantling of the structure from the level of 39m to 8m,
- dismantling of reinforced concrete slabs together with steam ejections,
- dismantling of grate,
- dismantling of boiler heater funnel.
The demolition of the K1-K2 boiler house building on the premises of Zakłady Azotowe Puławy was the first disassembly carried out by FINOW POLSKA Sp. z o.o.
The following photos show the disassembly of the grate