2024

  • Starting work of the new machine MultiProfiler 3D by STIGAL
  • Commissioning of the photovoltaic installation

2024

2023

  • Purchase of a Doosan Cobot and commissioning of a welding automation station using it
  • Installation in the company car park 2 charging stations for electric cars

2022

  • Purchase of a 12 channel resistance annealer from LMS for local heat treatment

2022

2021

  • Implementation and certification of the Company in the scope of EN 13084-7

2020

  • Renovation and modernisation of the single-aisle assembly hall
  • Start of production of SCR (Selective Catalytic Reduction) systems

2020

2019

  • Implementation and certification of the Company's PN-ISO 45001:2018 Management Systems Standard

2018

  • Signing of a cooperation agreement with the School Complex No. 3 in Ostrowiec Św. in order to improve vocational training and provide classes for students of the patronage class
  • Start of production of tee butterfly valves for the maritime industry for SAMMET Dampers OY and WES Technik & Service GmbH

2018

2017

  • Purchase of ZINSER CNC plasma machine

2016

  • Construction and commissioning of a paint and lacquer booth
    Implementation and certification of the Company with the new PN-EN ISO 9001:2015 and PN-EN ISO 14001:2015 standards
  • Commencement of two significant pipeline prefabrication contracts for Mitsubishi Hitachi Power Systems, Ltd.
  • Obtaining qualified supplier certification from Mitsubishi Hitachi Power Systems, Ltd.

2016

2015

  • Modernisation of unit no 9 and 10 - PGE Elektrownia Bełchatów

2014

  • Implementation of the B&R project

2014

2013

  • Implementation and certification of the Company's PN-N 18001:2004 occupational health and safety management systems

2012

  • Implementation of the PN-EN 1090-1:2009+A1:2011 standard and obtaining a certificate of conformity for factory production control
  • Commencement of cooperation with HIAK AB in the field of production of stainless steel turbine housings, noise and protection walls for the turbine and filter housings
  • Commencement of cooperation with BarkerBille and Moldow A/S for the production of stainless steel and carbon steel soundproof duct casings and fan casings

2012

2011

  • Obtaining authorisations from the Office of Technical Inspection to manufacture, modernise, repair equipment subject to technical supervision

2010

  • Implementation and certification of the Company's PN-EN ISO 14001 Environmental Management Systems
  • Modernisation of Block 5 - PGE Elektrownia Bełchatów

2010

2009

  • First assembly in Poland - Europe's largest rotary air heater (LUVO) for a 858 MW unit at the Belchatow Power Plant

2008

  • Implementation and certification of the company in accordance with EN ISO 3834-2
  • Company certification for the manufacture of pressure parts according to Module G of the Pressure Directive
  • Installation and commissioning of blast cabin (double-walled)
    First off-site installation - Emile Huchet power station in Saint Avold, France

2008

2008

  • Installation and commissioning of blast cabin (double-walled)
    First off-site installation - Emile Huchet power station in Saint Avold, France

2007

  • Implementation and certification of the Company's PN-EN ISO 9001 Quality Management Systems
  • Start of diffuser production for BAEDEN EUROPE (for Alstom / GE and Siemens gas turbines)

2007

2006

  • Start of prefabrication of the pipelines

2005

  • Opening of the production facility in Ostrowiec Św.
  • Start of production of Diverters and long-term cooperation with BRADEN EUROPE B.V.

2005

2001

  • Change of Company name to "FINOW POLSKA"

1999

  • Establishment of the company "PROKURA Polska", based in Szczecin

1999